Files
c0de.it/docs/rack-planner/roadmap.md
Lars Gebhardt-Kusche 98dd388fda
All checks were successful
Deploy / deploy (push) Successful in 14s
asdasd
2026-05-15 22:15:31 +02:00

1.3 KiB

Roadmap

Phase 0: Product foundation

  • finalize terminology and target market
  • define core rack and component schemas
  • prepare UX wireframes for the editor
  • prepare initial built-in component catalog

Phase 1: MVP

  • project creation
  • rack editor for 10" and 19"
  • drag-and-drop placement
  • U grid and collision checks
  • built-in catalog
  • BOM export as CSV
  • plugin pack import with JSON plus SVG
  • simple cable estimation

Phase 2: Public beta

  • user accounts
  • project persistence
  • shareable project links
  • improved BOM formatting
  • printable rack reports
  • better plugin management UI

Phase 3: Professional planning

  • 3D preview
  • manufacturer packs
  • advanced validation rules
  • richer cable routing logic
  • multi-rack projects
  • PDF export packages

Phase 4: Commercial maturity

  • team workspaces
  • access control
  • audit log
  • supplier and ERP exports
  • private catalogs
  • self-hosted deployment option

Product recommendation

The strongest path is:

  1. ship a narrow and useful browser editor first
  2. prove demand with real planners and installers
  3. expand catalogs, exports, and collaboration after usage feedback

The public internet goal is realistic, but only if V1 stays disciplined and does not start as a generalized CAD platform.